Culligan Mark 100 Provozní pokyny Strana 23

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 30
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 22
Operation
DISPLAY
There are two display modes on the Culligan
®
microprocessor. As shipped from the factory, the display of the
board is initially set to turn off if there has been no keyboard activity after a 1 minute period. Touching any key
will relight the display. The display can be set so that it will always display the time. For information on
changing the display lighting option, refer to the programming section.
REGENERATION
There are several conditions that will cause the control to trip a regeneration. The 'REGEN' enunciator will light
when the control has signaled for a regeneration. The 'REGEN' enunciator will flash while the control is in
regeneration. The following are conditions that will call for regeneration:
1. When the Aqua-Sensor
®
probe senses the hardness in the Cullex
®
media.
2. When the Soft-Minder
®
meter has recorded the passage of a predetermined number of gallons.
3. When the time clock has counted past the set number of days.
4. At the preset time, when the number of days without a regeneration is equal to the days set in menu #8A.
5. At the preset time, when the 'REGEN.’ button is depressed once. 'REGEN.' will light.
6. Immediately, when the ‘REGEN.” button is depressed twice. 'REGEN.' will light and blink.
7. Immediately, if power to the unit has been off for more than 3 hours.
If dip switch 6 is in the ON position, the unit will begin a regeneration immediately for instances 1 and 2. With
dip swith 6 in the OFF position, the regeneration will not begin until the preset regeneration time.
START-UP
NOTICE: A sanitizing agent is added to the softener at the factory. Flush the tank to drain with a minimum of
40 gallons of water, or initiate a full regeneration cycle, prior to putting the unit into service.
Close the main water supply valve.
Set the Cul-Flo-Valv
®
to the bypass position.
Ensure that all faucets at the installation site are closed.
Direct the drain line discharge into a bucket where flow can be observed.
Plug the transformer into a 120 Volt, 60 Hz, single-phase receptacle.
Wait 1 minute for the control to energize the motor and home itself.
Set the timer to the correct time of day.
Open the main supply valve.
Initiate an immediate regeneration to move the control into the backwash position.
Refer to the section on manual cycling for information on cycling the control through its positions.
When in the backwash position, slowly shift the bypass to the soft water position until water flows.
Allow the tank to fill slowly until water flows from the drain line.
When flow to drain is established, open the bypass fully. Watch the drain line discharge for signs of resin.
If signs of resin particles appear, reduce the flow. Increase the flow again when resin no longer appears in
the discharge.
When the unit is filled with water, return the timer to the service position and proceed with setting the
microprocessor. Refer to the programming section.
NOTICE: Unplugging the Culligan
®
Mark 100 water softener will not affect any of the timer settings. Once
programmed in, the settings will be stored indefinitely. In the event of a power failure the time-of-day setting
will be stored for 1-2 days. If longer time storage is necessary, a battery backup is available. Refer to the
Service Manual for additional information.
OPERATION 21
Zobrazit stránku 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 29 30

Komentáře k této Příručce

Žádné komentáře